Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

WIS 35 (Tower Ave.) Reconstruction Project - Maps

Project location

Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project boundary.
View NW, WIS 35 (Tower Ave.) Reconstruction Project in a larger map.

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

June 19, 2012 - PIM maps/exhibits

Design concepts

October 25, 2011 - PIM maps/exhibits

Design concepts

February 18, 2010 - PIM maps/exhibits

Design concepts

Visit Wisconsin DOT, DMV or DNR offices during construction

Questions about the content of this page, contact:
WisDOT Northwest Region Office, nwr.dtsd@dot.wi.gov
Last modified: July 11, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.