  • 1974 – The existing WIS 13 intersection was built as a modified type A intersection.
  • 1978 - Two lights and an overhead sign for eastbound US 2 were added.
  • 1991-1992 – US 2 was converted to a divided highway through the intersection. The existing lanes are now the eastbound 2 roadway.
  • 2003 – The current configuration was created with the single through lane on westbound US 2.
  • 2006 – The final modification adding rumble strips and LED’s.
  • 2008 - Planning and design began and the project was enumerated by the legsislature.


Related information:

WisDOT roundabout information

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey