Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 151 Freeway Conversion - Project reports

Aerial view of the US 151/County D interchange, south of Beaver Dam.

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Phase 1 report

This report summarizes the data collected along the US 151 corridor:

  • Current and future traffic projections
  • Current and future land use plans
  • Safety concerns
  • Environmental resources
  • Details preliminary concepts for possible interchange locations, frontage road scenarios, and connections to the local road system

To make arrangements to view the report or to obtain a printed copy or a copy on CD contact:

Mark Westerveld
(608) 246-5355
mark.westerveld@dot.wi.gov

There will be a charge for hard copies and CDs. You will be notified of any charges prior to the material being sent.

Questions about the content of this page:
Mark Westerveld, mark.westerveld@dot.wi.gov SSI - Contacts
Last modified: June 25, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.