US 151 Freeway Conversion - Environmental documents

Wetlands along US 151 south of Beaver Dam.
  • 2013-2014 - Environmental study scheduled to be completed.
  • 2014-2016 - Prepare official map.

An Environmental Assessment (EA) will be produced during phase 2 of the study. The EA will evaluate the environmental impacts of a number of alternatives developed during the study.

The EA phase began in 2010 with anticipated completion in 2012.

WisDOT environmental information

WisDOT projects and construction sometimes change the natural environment around a project area. To minimize the effects of road construction and development WisDOT works to reduce change to the natural environment and leads several efforts to restore project areas.

Questions about the content of this page:
Mark Westerveld, mark.westerveld@dot.wi.gov SSI - Contacts
Last modified: June 25, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.