Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 14/61 (Westby-Viroqua) Improvements
Segment 3 - Viroqua Bypass
Viroqua, Vernon County

Segment 3, Viroqua Bypass.
View US 14/61 (Westby-Viroqua) Improvements, Segment 3 - Viroqua Bypass project maps.
Wisconsin 511 travel information

Project location

US 14/61, Springville Rd. to County T/WIS 27/WIS 82, east side of Viroqua, in Vernon County.

Project overview

  • Design for this section of US 14/61 consists of a two-lane facility on new alignment.
  • Roadway to connect with the new four-lane highway near Springville Rd. and to extend 5.3 miles south to just past the WIS 27/WIS 82/County T intersection with existing US 14/61.
  • New roadway to consist of two 12-foot driving lanes and 6-foot shoulders on each side.
  • Project cost estimated at $8.5 million.

Status/phase

Design work with no construction activity.

Questions about the content of this page, contact:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: June 24, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.