Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 14/61 Improvements - Environmental documents

Wild lupine along a roadway.

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Agricultural Impact Statement (AIS)

Final Environmental Impact Statement (FEIS)

Note: New material in the FEIS is either highlighted with shading or noted with a vertical line in the margin.

FEIS re-evaluation

Location to view hard copies of the plan

Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Rd.
La Crosse, WI 54601

WisDOT environmental information

WisDOT projects and construction sometimes change the natural environment around a project area. To minimize the effects of road construction and development WisDOT works to reduce change to the natural environment and leads several efforts to restore project areas.


Back Back to Segment 2 (Westby Bypass)

Back Back to Segment 3 (Viroqua Bypass)

Back Back to Segment 1 (Westby to Viroqua, four-lane divided highway) - project completed

SSI Contact Questions about the content of this page, contact:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: June 24, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.