Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 12, aka Wisconsin Dells Parkway - Project reports

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Aug. 2011 - Roadway safety audit (RSA)


In response to a pedestrian fatality that occurred in the summer of 2011, WisDOT conducted a roadway safety audit.

The RSA identified both short term safety improvements that could be incorporated in the resurfacing project as well as more long term improvements that will be evaluated through the corridor study process.

Feb. 2011 - Safety Study


The purpose of this study was to define the scope of the corridor study as well as develop a range of costs associated with alternatives to assist with planning for the funding of the corridor study project.

To make arrangements to view the report or to obtain a printed copy or a copy on CD contact:

Jeremy Krachey, WisDOT Project Manager
(608) 789-5702
jeremy.krachey@dot.wi.gov

There will be a charge for hard copies and CDs. You will be notified of any charges prior to the material being sent.

Questions about the content of this page:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: June 18, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.