Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

Business 51 (Post Road) - Traffic impacts

Road construction.

Quick access

Basics

No traffic impacts at this time. Roadway is open to traffic.

Spring 2016

  • Construction currently scheduled to occur from Green Dr. to Springville Dr.
  • Business 51 will remain open to traffic during construction with the exception of a 5 day closure required for railroad work. Business 51 between Willow Drive and Chestnut Drive will be closed to through traffic and detoured via I-39.
  • For the majority of construction, motorists can expect to encounter one lane in each direction.
  • Access to properties along the corridor will be provided during construction but may not be directly off of Business 51. Access may be through alley ways, side roads, or temporary entrances.
  • Temporary driveway closures may be necessary when constructing the new driveways. WisDOT will contact homeowners and businesses in advance before temporarily closing a driveway.

Work zone safety tips

  • Buckle up for safety
  • Expect the unexpected
  • Stay alert
  • Watch for flagging operations
  • Merge as soon as possible
  • Don't speed. Remember, fines double in work zones
  • Don't tailgate
  • Keep a safe distance
  • Observe posted signs
  • Be patient

SSI - Project contacts Questions about the content of this page:
WisDOT North Central Region Office, ncr.dtsd@dot.wi.gov
Last modified: April 10, 2015

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.