Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

I-39 Stevens Point Area Corridor Study - Need/purpose

Traffic on I-39.

Need

The study is needed to assess current and future needs of the corridor and to determine safety, operations, pavement and bike/pedestrian needs. Several of the interchanges in the project area are experiencing operational, safety and geometric deficiencies due to traffic volumes and commercial development in the area. In addition, the existing freeway pavement is deteriorating.

Purpose

  • Identify a long-term vision for the I-39 Stevens Point area corridor.
  • Provide a safe and efficient transportation system meeting current and near future needs.
  • Serving long-term traffic demand through freeway and interchange capacity improvements.

Project benefits

The study will provide a long-term vision and relative timeline for capacity and safety improvements along the I-39 Stevens Point area corridor. The study will also identify associated impacts and costs. This will allow WisDOT to strategically implement projects in a cost-effective manner.

SSI - Project contacts Questions about the content of this page:
WisDOT North Central Region Office, ncr.dtsd@dot.wi.gov

Last modified: November 6, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.