Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 63/WIS 64
New Richmond, St. Croix County

View NW, US 63/WIS 64 project location.
Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project limit.
Wisconsin 511 travel information

Project location

US 63/WIS 64 in New Richmond, in St. Croix County (WIS 65 to County D, WIS 64 to County Q)

Project overview

  • Planning Study to preserve land needed for capacity expansion.
  • Allows WisDOT, local governments, and property owners to make informed decisions for changes to land uses along the corridor.
  • This roadway is a Corridors 2030 Connector Route it is an important tourist and freight route connecting Northwest Wisconsin to I-94 and the Twin Cities.
  • Project cost estimated at $ 50,000,000 in 2006.

Status/phase

Planning and Environmental Study complete, additional engineering to take place prior to construction. Construction date has not been established.

SSI - Project contacts Questions about the content of this page, contact:
WisDOT Northwest Region Office, nwr.dtsd@dot.wi.gov
Last modified: July 31, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.