skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

South La Crosse study

Need

Schedule

Maps

Public involvement

Contacts

South La Crosse transportation study - Maps

Segment A | Segment B | Segment C | Alternative concepts

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Study overview/location

Three segments (A, B and C) are being analyzed in the South La Crosse transportation study.

Segment A - Green Bay Street south to the separation of US 14 with WIS 35.

Map of segment A of the South La Crosse transportation study.

Segment B - US 14 from its separation with WIS 35 to La Crosse County M.

Map of segment B of the South La Crosse transportation study.

Segment C - WIS 35 from its separation with US 14 to County K.

Map of segment C of the South La Crosse transportation study.

Alternative concepts under study

Four-lane, variable-width median mainline alternative

Hybrid mainline alternative

Two-way left-turn lane mainline alternative

Top Return to top


 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey